The Alaskan Mill is strapped to the front of the Honda 300 quad for when the planking needs to be made. First Bryan located the likely spot for building a bridge. Then he had to walk a fallen dead blow down to get to the other side. Then he proceeded to fall the first tree. Then he confidently placed cut roller logs on that tree and fell another one onto that log.
Then with the help of the pivee and the quad winch he moved the big log in to place.
There was alot of grub hoeing and winching.... but the approach hill got lowered.
Bryan filled in the approach with logs and at 7pm traveled the hard hour trip back to base camp. The next morning he was off to Alaskan Mill the 20 feet long bridge.
No comments:
Post a Comment
GLAD TO HEAR FROM YOU.
Note: Only a member of this blog may post a comment.